offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Siemens Gamesa Turbines for Hollandse Kust (Noord)
Wind Farm Update

July 30, 2020 · about 6 years ago

Siemens Gamesa Turbines for Hollandse Kust (Noord)

The CrossWind consortium has opted for Siemens Gamesa’s SG 11.0-200 DD wind turbines for the 759 MW Hollandse Kust (noord) wind farm in the Dutch North Sea. According to the winning bid submitted by the consortium of Shell and Eneco, the wind farm will feature 69 Siemens Gamesa wind turbines, the Du

1 minutes read
  • LinkedIn
  • X
  • Email
Siemens Gamesa Turbines for Hollandse Kust (noord)

The CrossWind consortium has opted for Siemens Gamesa’s SG 11.0-200 DD wind turbines for the 759 MW Hollandse Kust (noord) wind farm in the Dutch North Sea.

According to the winning bid submitted by the consortium of Shell and Eneco, the wind farm will feature 69 Siemens Gamesa wind turbines, the Dutch government said.

Each turbine will have a capacity of 11 MW and a rotor diameter of 200 metres, and the majority of units will be situated over one kilometre from each other.

The wind turbines will be transported to the site some 18.5 kilometres off the west coast of the Netherlands and installed by Van Oord .

CrossWind has already reached a final investment decision on the project. The subsidy-free wind farm is scheduled to be fully operational in 2023.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago