offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Locally Built CTV for Yunlin OWF Launched
Operations & Maintenance

August 10, 2020 · about 6 years ago

Locally Built CTV for Yunlin OWF Launched

A Taiwan-built crew transfer vessel (CTV) which will operate at the Yunlin offshore wind farm has been completed and launched, according to Deutsche Windtechnik. The CTV, named Prosperous 1 (風盛1號), was ordered by the developer wpd and the service provider Deutsche Windtechnik from Prosperous Wind Sh

1 minutes read
  • LinkedIn
  • X
  • Email
A close-up of Prosperous 1 vessel name on the portside

A Taiwan-built crew transfer vessel (CTV) which will operate at the Yunlin offshore wind farm has been completed and launched, according to Deutsche Windtechnik.

The CTV, named Prosperous 1 (風盛1號), was ordered by the developer wpd and the service provider Deutsche Windtechnik from Prosperous Wind Shipping, and built by LungTeh shipyard.

“The vessel is the first locally built CTV for Prosperous Wind Shipping in Taiwan and will be used to transport local technicians and materials to Yunlin offshore wind farm” , Deutsche Windtechnik stated.

The Germany-headquartered service provider secured a contract for the Yunlin project with wpd in 2018, and later established a new regional unit in Taiwan.

Under the contract with wpd, Deutsche Windtechnik is in charge of a large part of wind turbine maintenance above and below water, as well as technical management for the Yunlin offshore wind farm.

The offshore wind farm, owned by wpd (73 per cent) and by a Sojitz Corp-led consortium (23 per cent), will feature 80 Siemens Gamesa 8 MW turbines installed some 8 kilometres off the Taiwanese coast.

The project is scheduled to come online in 2021.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago