offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Ventus Marine Takes Delivery of Formosa 1 CTV
Vessels

August 13, 2020 · about 6 years ago

Ventus Marine Takes Delivery of Formosa 1 CTV

Ventus Marine has taken delivery of crew transfer vessel (CTV) Ventus Lugang which will service the Formosa 1 offshore wind project in Taiwan. Ventus Lugang was delivered on 1 August at the Port of Kaohsiung and will join its sisters CTV Ventus Beigang and service accommodation transfer vessel (SATV

1 minutes read
  • LinkedIn
  • X
  • Email
Ventus-Marine-Takes-Delivery-of-Formosa-1-CTVVentus-Marine-Takes-Delivery-of-Formosa-1-CTV

Ventus Marine has taken delivery of crew transfer vessel (CTV) Ventus Lugang which will service the Formosa 1 offshore wind project in Taiwan.

Ventus Lugang was delivered on 1 August at the Port of Kaohsiung and will join its sisters CTV Ventus Beigang and service accommodation transfer vessel (SATV) Ventus Formosa as the primary fleet to provide O&M support for the 128 MW project.

The catamaran-design CTV was built by Penguin International Limited in Singapore.

According to the company, the pioneer group of seafarers onboard the vessel has undergone a series of familiarisation training and is ready to be deployed operationally.

At the end of last year, Singapore-based PSA Marine and Taiwanese Ta Tong Marine formed the joint venture company Ventus Marine to service a long-term contract awarded by Siemens Gamesa for Formosa 1.

The Formosa 1 wind farm consists of the 8 MW Formosa 1 Phase 1 , inaugurated in May 2017, and the 120 MW Formosa 1 Phase 2 which was officially commissioned in November 2019.

The project comprises two Siemens Gamesa 4 MW turbines and 20 Siemens Gamesa 6 MW units.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago