offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JERA Reveals Ishikari Bay Offshore Wind Project
Business & Finance

August 25, 2020 · about 6 years ago

JERA Reveals Ishikari Bay Offshore Wind Project

Japanese utility JERA has submitted the Planning Phase Environmental Impact Statement for an offshore wind project off Ishikari Bay in Japan. The planned offshore wind farm will be located at least 2.5km offshore from Ishikari and Otaru and is expected to include up to 65 turbines with a maximum gen

1 minutes read
  • LinkedIn
  • X
  • Email
JERA Reveals Ishikari Bay Offshore Wind Project

Japanese utility JERA has submitted the Planning Phase Environmental Impact Statement for an offshore wind project off Ishikari Bay in Japan.

The planned offshore wind farm will be located at least 2.5km offshore from Ishikari and Otaru and is expected to include up to 65 turbines with a maximum generation capacity of 520 MW.

JERA stated that Ishikari Bay is suitable for the installation of bottom-fixed foundations due to its favorable wind conditions, shallow seabed, and the spare capacity of the nearby power grid.

According to the company, the project includes the installation of an energy storage system to mitigate the impact on the power system of fluctuations in wind power generation output.

A public review process for the Environmental Impact Statement is about to begin and end on 24 September.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago