offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Boskalis Secures First Floating Wind Project
Contracts & Tenders

September 2, 2020 · about 6 years ago

Boskalis Secures First Floating Wind Project

Boskalis has won the contract to transport and install five floating wind turbines for the Kincardine floating wind farm in Scotland. For Cobra Wind International Ltd, Boskalis will transport and install the MHI Vestas 9.525 MW floating wind turbines at the site fifteen kilometers off the coast of A

1 minutes read
  • LinkedIn
  • X
  • Email
Boskalis Scores First Floating Wind Gig

Boskalis has won the contract to transport and install five floating wind turbines for the Kincardine floating wind farm in Scotland.

For Cobra Wind International Ltd, Boskalis will transport and install the MHI Vestas 9.525 MW floating wind turbines at the site fifteen kilometers off the coast of Aberdeen. This will be Boskalis’ first floating wind farm project.

The turbines will be anchored at a depth of sixty to eighty meters. In September 2020, the heavy anchor handling tug (AHT) BOKA Falcon will start installing the anchors and chains on the seabed.

In the meantime, the floating foundations will be transported from Ferrol in Spain to Rotterdam, for which Boskalis will deploy the Fjord as a semi-submersible barge.

In Rotterdam, the wind turbines will be mounted on the foundations, after which the floating wind turbines are towed to the wind farm.

In addition to the BOKA Falcon and Fjord, three Boskalis AHTs will be deployed on this project.

Once fully built, the 50 MW Kincardine will comprise six turbines, one 2 MW unit which was commissioned back in October 2018, and the five 9.525 MW turbines, all supplied by MHI Vestas and installed on semi-submersible floating structures designed by Principle Power.

The wind farm is scheduled to be commissioned by the end of 2020 when it will become the largest operating floating wind farm in the world.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago