offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›10+ MW Floating Wind Turbine Project Kicks Off
R&D

September 30, 2020 · about 5 years ago

10+ MW Floating Wind Turbine Project Kicks Off

The Iberdrola-led international consortium has launched the FLAGSHIP project to develop and fabricate the first 10+ MW floating offshore wind turbine. The turbine will be supported by a floating semi‐submersible concrete structure based on Olav Olsen’s OO-Star Wind Floater concept. The prototype is

1 minutes read
  • LinkedIn
  • X
  • Email
10+ MW Floating Wind Turbine Project Kicks Off

The Iberdrola-led international consortium has launched the FLAGSHIP project to develop and fabricate the first 10+ MW floating offshore wind turbine.

The turbine will be supported by a floating semi‐submersible concrete structure based on Olav Olsen’s OO-Star Wind Floater concept.

The prototype is scheduled to be installed and commissioned at Metcentre outside Karmøy, Norway, by the end of 2022.

Apart from Iberdrola, the consortium also includes Core-Marine, Cener, IHC, Zabala Innovation Consulting, Olav Olsen, Kvaerner, UnitechSubsea, Metcentre, EDF, DTU, and DNV-GL.

FLAGSHIP is a Horizon 2020 project that aims to reduce the Levelized Cost of Energy (LCOE) for floating offshore wind to the range 40‐60 EUR/MWh by 2030.

This demonstration project will manage a EUR 25 million funding during its four years duration.

According to the project’s schedule, the production of the floating platform could start in the third quarter of 2021 and its installation at sea in the first quarter of 2022.

The project will focus on the testing of a cost-effective concrete floating platform and anchoring system for a 10+ MW wind turbine, including electrical connection in a demanding site location of the North sea, in order to pave the way towards the mass production and installation in a worldwide range of commercial scenarios.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago