offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›EolMed Floating Wind Project to Feature MHI Vestas 10 MW Turbines
Wind Farm Update

October 5, 2020 · about 5 years ago

EolMed Floating Wind Project to Feature MHI Vestas 10 MW Turbines

Qair, formerly known as Quadran Énergies Marines, has signed a preferred supplier agreement with MHI Vestas for three 10 MW offshore wind turbines for the EolMed floating wind pilot project in France. This will be the second floating wind project in which the company’s V164 turbine’s nominal capacit

2 minutes read
  • LinkedIn
  • X
  • Email
Thor Wind Turbine
Thor Wind Turbine

Qair, formerly known as Quadran Énergies Marines, has signed a preferred supplier agreement with MHI Vestas for three 10 MW offshore wind turbines for the EolMed floating wind pilot project in France.

This will be the second floating wind project in which the company’s V164 turbine’s nominal capacity is brought to 10 MW, following Eoliennes Flottantes du Golfe du Lion (EFGL) for which the MHI Vestas 10 MW model was selected last year.

The three V164-10.0 MW turbines for the 30 MW EolMed project will be installed on Ideol’s Damping Pool floating foundation at a site in the Mediterranean Sea some 18 kilometres off the coast of Gruissan in the Aude region.

EolMed is scheduled to be built in 2023.

“The combination of proven technologies such as Ideol’s patented Damping Pool foundation and MHI Vestas’ V164-10.0 MW turbine can potentially enable a quicker route to market for floating wind projects in Europe and Asia, where MHI Vestas deploys strong operational presences” , MHI Vestas states in a press release from 5 October.

EolMed is the third floating offshore wind project for MHI Vestas in France and the sixth floating project overall.

The wind turbine supplier has also been chosen for the Groix & Belle Ile floating wind farm, for which it will deliver three of its V164-9.5 MW wind turbines.

EFGL and Groix & Belle Ile projects in France are expected to be built in 2022 and 2023, respectively.

Outside France, two more floating wind farms will comprise MHI Vestas wind turbines: Windfloat Atlantic in Portugal and Kincardine in Scotland.

The now decommissioned WindFloat 1 project in Portugal was also featuring an MHI Vestas turbine.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago