offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›CWind Taiwan Nets BOP Contract for Formosa 1
Business & Finance

October 15, 2020 · about 5 years ago

CWind Taiwan Nets BOP Contract for Formosa 1

CWind Taiwan has been awarded a balance of plant (BOP) contract for the Formosa 1 offshore wind farm. The company is providing inspection and maintenance services to the 22 turbines at Formosa 1 Phase 1 and Formosa 1 Phase 2 sites, including internal and external inspections and painting. Under the

2 minutes read
  • LinkedIn
  • X
  • Email
A wind turbine technician climbing the yellow foundation of an offshore wind turbine

CWind Taiwan has been awarded a balance of plant (BOP) contract for the Formosa 1 offshore wind farm.

The company is providing inspection and maintenance services to the 22 turbines at Formosa 1 Phase 1 and Formosa 1 Phase 2 sites, including internal and external inspections and painting.

Under the contract, signed with Formosa 1 Wind Power Co. ltd (FOWI), CWind has deployed its Taiwan-flagged crew transfer vessel Ocean Surveyor 3 and its in-house technicians in September 2020.

Since Formosa 1 is the first offshore wind farm in Taiwan to move into the operations and maintenance (O&M) phase, the first team of Taiwanese technicians to graduate from CWind Taiwan’s Global Wind Organisation (GWO) training school will work on the project, alongside their colleague senior technicians from CWind in Europe.

The Ocean Surveyor 3 CTV and its crew have been supporting the Formosa 1 project out of the Nanliao fishing harbour since 2016, and now have extensive knowledge of the sea conditions and familiarity with the local authorities there. The company will use the same port for its BOP campaign too, saying that utilising this location increases project efficiency as transit time is minimised.

Formosa 1 entered commercial operation on 27 December 2019.

The 128 MW wind farm consists of the 8 MW Formosa 1 Phase 1, inaugurated in May 2017, and the 120 MW Formosa 1 Phase 2 which was officially commissioned in November 2019.

Formosa 1’s first phase comprises two Siemens Gamesa 4 MW turbines and the second phase features 20 Siemens Gamesa 6 MW turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago