offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Fugro Ready With Hollandse Kust West Geotechnical Data
R&D

October 20, 2020 · about 5 years ago

Fugro Ready With Hollandse Kust West Geotechnical Data

Fugro has completed the geotechnical survey operations at the Hollandse Kust (West) offshore wind farm zone in the Netherlands. The activities included mapping the bathymetry, the shallow geology and identifying existing infrastructure. An extensive intrusive campaign followed with hundreds of CPTs,

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro Ready With Hollandse Kust West Geotechnical Data

Fugro has completed the geotechnical survey operations at the Hollandse Kust (West) offshore wind farm zone in the Netherlands.

The activities included mapping the bathymetry, the shallow geology and identifying existing infrastructure.

An extensive intrusive campaign followed with hundreds of CPTs, seismic CPTs and boreholes. Subsequently, a year’s worth of laboratory tests was executed, RVO.nl said.

According to the Dutch agency, in-depth interpretations were performed to build bridges between geophysics and geotechnics.

The results will provide tenderers with the ability to further de-risk their wind farm development. Additional boreholes should not be required by the winner of the HKW permit tender, as sufficient sample material will be remaining.

RVO.nl and Fugro will publicly disclose the results in two webinars. The first will be held on 5 November, when the results of the geophysical and geotechnical surveys, including the geological model, will be presented.

The resulting geotechnical ground model will be discussed on 19 November. This webinar will also cover the geotechnical parameters report and will present the results of applying technology to derive synthetic (predicted) CPT profiles across the project area by linking ultra-high-resolution geophysical data with geotechnical data.

The call for tender for Hollandse Kust (West) is expected in the second quarter of 2021.

The wind farm zone is located 51 km off the west coast of the Netherlands and comprises two 760 MW lots covering approximately 349 km2.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

15 days ago