offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›GE Haliade-X Breaks 300 MWh Daily Output Ceiling
R&D

November 11, 2020 · about 5 years ago

GE Haliade-X Breaks 300 MWh Daily Output Ceiling

The prototype GE Haliade-X offshore wind turbine has produced 312 MWh of electricity in a single 24-hour period, once again setting a new world record. This is according to John Lavelle, CEO Offshore Wind at GE Renewable Energy. The prototype turbine, installed in the Port of Rotterdam, produced its

2 minutes read
  • LinkedIn
  • X
  • Email
GE Haliade-X Breaks 300 MWh Daily Output Ceiling

The prototype GE Haliade-X offshore wind turbine has produced 312 MWh of electricity in a single 24-hour period, once again setting a new world record.

This is according to John Lavelle, CEO Offshore Wind at GE Renewable Energy.

The prototype turbine, installed in the Port of Rotterdam, produced its first power in November 2019 and has since set several world records for 24-hour output.

The most recent record of 312 MWh was reached after the prototype had been optimize d to operate at a 13 MW power output.

This is an improvement of 24 MWh compared to the previous record 24-hour output of 288 MWh set in February 2020 when the unit operated at 12 MW.

”I feel particularly proud to see the progress the teams are making in such a short amount of time. Our HaliadeX prototype is now operating at 13 MW, which means we are able to generate more electricity with the same machine, all the while keeping our costs low,” Lavelle said in a social media post.

GE plans to start the serial production of the Haliade-X at the Saint-Nazaire factory in France during the second half of 2021.

The Haliade-X 13 MW offshore wind turbine will be used in the first two phases of the Dogger Bank Wind Farm, with a total of 190 units to be installed off the UK starting in 2023.

The Haliade-X technology has also been selected by Ørsted as the preferred wind turbine for the 120 MW Skipjack and the 1,100 MW Ocean Wind projects in the US.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

21 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago