offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Cemre Shipyard Launches Third MHI Vestas SOV
Operations & Maintenance

November 13, 2020 · about 5 years ago

Cemre Shipyard Launches Third MHI Vestas SOV

Cemre Shipyard has launched the third of the three service operation vessels (SOVs) ordered by Esvagt and under long-term charters with MHI Vestas Offshore Wind. The Turkish shipbuilder launched the hull of the first SOV in April and the second one in September. The 70-5 metre SOVs were ordered at N

2 minutes read
  • LinkedIn
  • X
  • Email
Thor Wind Turbine
Thor Wind Turbine

Cemre Shipyard has launched the third of the three service operation vessels (SOVs) ordered by Esvagt and under long-term charters with MHI Vestas Offshore Wind.

The Turkish shipbuilder launched the hull of the first SOV in April and the second one in September.

The 70-5 metre SOVs were ordered at Norway’s Havyard Group. The fitting out, testing, and completion of the vessels will be carried out at Havyard Ship Technology’s Leirvik shipyard in Sogn.

The SOVs were initially scheduled to be delivered between the third quarter of 2020 and the first quarter of 2021.

Esvagt has since accepted a delay in the deliveries of the vessels due to Havyard going through ”financial whirlwinds” . The new delivery dates have since not been disclosed.

Havyard recently announced downsizing and restructuring measures at the Leirvik shipyard which will lead to the discontinuation of the shipbuilding activities there.

The facility will be restructured into a repair and service yard and the staff will be reduced by about 100 in the coming year.

According to CEO of Havyard Group Gunnar Larsen, the said measures will not affect the delivery timeline of Havyard’s six current newbuild projects scheduled for delivery in 2020 and 2021, including the three Esvagt SOVs.

”The downsizing will take place in correlation with the completion of the newbuilds and the shift in activities at the yard as it receives new service assignments,” Havyard said in a statement.

The Norwegian company has not completely ruled out the newbuild activities in the future.

Once delivered, the SOVs will start their 15-year charters with MHI Vestas and be deployed on the Borssele III and IV offshore wind farm in the Netherlands, the Triton Knoll wind farm offshore England, and the Moray East wind farm off Scotland.

The vessels will be equipped with a compensated walk-to-work gangway and daughter craft, as well as multiple other features, and will have the capacity to accommodate up to 60 persons.

Related Articles

Business & Finance

Esvagt Accepts Delayed SOV Delivery from Havyard

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago