offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›NKT Snags Several Contracts with Elia, 50Hertz, Nemo Link
Contracts & Tenders

November 23, 2020 · about 5 years ago

NKT Snags Several Contracts with Elia, 50Hertz, Nemo Link

NKT has been awarded five-year agreements by Elia, 50Hertz, and Nemo Link for service works on their offshore assets, following competitive tendering procedures. The agreements cover several export cables connecting offshore wind parks to the onshore grid, and the interconnector Nemo Link connecting

2 minutes read
  • LinkedIn
  • X
  • Email
Thor Wind Turbine
Thor Wind Turbine

NKT has been awarded five-year agreements by Elia, 50Hertz, and Nemo Link for service works on their offshore assets, following competitive tendering procedures.

The agreements cover several export cables connecting offshore wind parks to the onshore grid, and the interconnector Nemo Link connecting Belgium and the UK.

“NKT has entered into service agreements with Elia, 50Hertz and Nemo Link with the purpose to ensure efficient integration of energy into the Belgian, UK and German power grid” , the company stated in a press release. “With the agreements, NKT and the three grid operators join forces to ensure minimum downtime in case of unpredicted damages to the assets included”.

For Elia and 50Hertz’s assets, the company will ensure offshore repair preparedness, including inspection and maintenance of spare parts, vessel support for fault localisation, offshore cable handling, offshore cable jointing work as well as engineering.

NKT said that an integral part of the agreements was also the vessel mobilisation guarantee.

Under the agreement with Nemo Link, the company will carry out all cable repair logistics.

“As the world moves towards green energy, the uptime of power cable connections become increasingly important to ensure efficient usage of the renewable energy produces. With these agreements, we are well prepared to support Elia, 50Hertz and Nemo Link with a fast response in the event of power cable damage. With the contracts, we once again demonstrate our leading market position as cable service provider for own as well as third party cables” , said Axel Barnekow-Widmark , Executive Vice President and Head of Service & Installation at NKT.

To carry out the work, the company will be providing its jointing technicians as well as suitable vessels, equipment and tools. NKT also highlighted that the work will be performed in accordance with tailored repair preparedness plans designed by the company itself to ensure a quick mobilisation in case of damages to the offshore power cables.

NOTE : This article was corrected and updated on 26 November, after receiving up-to-date information from NKT on the latest contracts.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago