offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Vietnam: New Wind Power FIT Proposed, GWEC Warns of Negative Effects
Authorities

December 3, 2020 · about 5 years ago

Vietnam: New Wind Power FIT Proposed, GWEC Warns of Negative Effects

Vietnamese Ministry of Industry and Trade has proposed new Feed-in Tariff (FIT) rates as part of the country’s plan for an extension of the FIT scheme for wind energy projects entering operation from November 2021 to December 2023. The new FIT proposal is reducing tariffs for intertidal/nearshore pr

2 minutes read
  • LinkedIn
  • X
  • Email
A nearshore wind farm in sunset

Vietnamese Ministry of Industry and Trade has proposed new Feed-in Tariff (FIT) rates as part of the country’s plan for an extension of the FIT scheme for wind energy projects entering operation from November 2021 to December 2023.

The new FIT proposal is reducing tariffs for intertidal/nearshore projects by 13.6 per cent and by 17.4 per cent for onshore wind power, which the Global Wind Energy Council (GWEC) called one of the most dramatic reductions seen for wind power globally.

While GWEC hailed Vietnamese government’s decision to approve an extension of the wind power Feed-in Tariff, the organisation said that the now proposed FIT rates risk significantly hindering wind power sector’s growth in Vietnam. The move could lead to slowing down investments and the creation of new jobs, according to GWEC.

The government decided to introduce a FIT extension for wind power to compensate for permitting and COVID-19- related delays, however, GWEC said that the dramatically reduced rates would derail investment in new and planned wind projects in Vietnam and threaten the country’s current position as a leading wind market in South East Asia. The organisation recommended a minimum six-month extension to the current FIT, followed by “milder” reductions to the FIT from May 2022 onwards.

“Developers already facing delays due to COVID-19, and the general challenges encountered in an early stage wind market would struggle to close financing, leading to a ‘bust’ period that could reduce new wind installations by up to 80 per cent in 2023, and a further 25 per cent per year thereafter” , GWEC said. “The reductions to the project pipeline would create missed job opportunities in the thousands and loss of billions of dollars in inward investment”.

Nearshore/intertidal wind projects are seeing a rise in Vietnam, with several wind farms now either nearing construction, in development or in planning.

So far, there are several intertidal wind farms being developed in the country, mostly with an installed capacity of around 50 MW, with some of them slated for commissioning from the third quarter of 2021 onwards. In November, plans for the country’s largest intertidal wind farm were revealed, which include building four wind farms that would make up the 350 MW Ca Mau 1 project off Nangen County in Ca Mau Province.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & Finance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago
Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago