Semco Maritime has won a study to identify the break-even point of high voltage direct current (HVDC) and high voltage alternating current (HVAC) transmission for a large-scale offshore wind farm.
Offshore wind farms are trending up in size, as well as the distance from the onshore connection these days. A key technological aspect that is heavily influenced by this change is the transmission system, i.e. the technology used to transmit the generated wind power to a connection point onshore.
