offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Wind Osprey Ready for Triton Knoll Turbines
Vessels

January 13, 2021 · about 5 years ago

Wind Osprey Ready for Triton Knoll Turbines

Cadeler has mobilized and handed over its jack-up vessel Wind Osprey for the installation of turbines at the Triton Knoll offshore wind project in the UK. The jack-up is now in Able Seaton Port where load out operations will take place for the duration of the project. According to Cadeler, the vesse

1 minutes read
  • LinkedIn
  • X
  • Email
Wind Osprey Ready for Triton Knoll Turbines

Cadeler has mobilized and handed over its jack-up vessel Wind Osprey for the installation of turbines at the Triton Knoll offshore wind project in the UK.

The jack-up is now in Able Seaton Port where load out operations will take place for the duration of the project.

According to Cadeler, the vessel was able to mobilize for the project and transit the North Sea despite wintery weather conditions in the Danish Port of Esbjerg.

Triton Knoll will feature 90 MHI Vestas V164-9.5 MW turbines located 32 kilometers off Lincolnshire.

In addition, Wind Osprey’s sister vessel Wind Orca, ex-Pacific Orca, officially received its new name on 12 January.

The decision to rebrand the vessels comes as a result of the establishment of Cadeler as a listed company in November 2020. The company stated that the names were selected to reiterate its commitment to serving the offshore wind industry.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

15 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago