offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Kongsberg Joins Hywind Tampen Crew
Contracts & Tenders

January 21, 2021 · about 5 years ago

Kongsberg Joins Hywind Tampen Crew

Kongsberg Maritime has secured a contract with Wood to supply positioning and monitoring equipment for the Hywind Tampen floating offshore wind farm. Kongsberg will supply its DPS position reference system and Motion Reference Unit (MRU) for what will be the world’s largest floating offshore wind fa

1 minutes read
  • LinkedIn
  • X
  • Email
Kongsberg Joins Hywind Tampen Crew

Kongsberg Maritime has secured a contract with Wood to supply positioning and monitoring equipment for the Hywind Tampen floating offshore wind farm.

Kongsberg will supply its DPS position reference system and Motion Reference Unit (MRU) for what will be the world’s largest floating offshore wind farm.

The DPS exploits all available GNSS infrastructure to deliver position information and is suited to monitor the location of the turbines relative to the seabed, the company said.

The MRU will check roll, pitch, yaw and heave motion, informing the blade trimming system to ensure that the turbine is not overloaded in strong winds and thus likely to become unstable. Marine traffic situational awareness and visibility to other vessels will be facilitated by the AIS AQ610 base station.

Hywind Tampen will feature 11 Siemens Gamesa 8 MW turbines installed about 140 km off the Norwegian coast in water depths of between 260 and 300 m.

Construction on the 88 MW project started in October 2020.

Once operational at the end of 2022, the wind farm will be directly connected to the Snorre A and B and Gullfaks A, B and C oil & gas platforms.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago