offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Tekmar Sends Off Jiangsu Qidong Cable Protection Systems
Wind Farm Update

January 22, 2021 · about 5 years ago

Tekmar Sends Off Jiangsu Qidong Cable Protection Systems

Tekmar Energy has completed the production and shipment of inter-array cable protection systems for the Jiangsu Qidong offshore wind farm in China. The contract was awarded in late 2020 and required a quick turnaround to meet the customer’s offshore construction schedule which commenced in the first

1 minutes read
  • LinkedIn
  • X
  • Email
Tekmar Delivers Jiangsu Qidong Cable Protection Systems

Tekmar Energy has completed the production and shipment of inter-array cable protection systems for the Jiangsu Qidong offshore wind farm in China.

The contract was awarded in late 2020 and required a quick turnaround to meet the customer’s offshore construction schedule which commenced in the first quarter of 2021.

The cable protection systems were produced at Tekmar Energy’s manufacturing facility in the North East of England with the final shipment dispatched to China in December.

The Jiangsu Qidong offshore wind farm comprises three projects (H1,H2, and H3) with a combined capacity of 800 MW. The wind farm is located between 31 and 40 kilometres off the coast of Qidong, Nantong Province.

The project, valued at over USD 2 billion, is owned and developed by Jiangsu Huawei Wind Power Co, and Qidong Hua Er Rui Wind Power Technology Co.

The wind farm’s engineering, procurement, and construction (EPC) contractor is PowerChina Huadong.

The groundbreaking ceremony marking the start of the wind farm’s construction was held in April 2020. The wind farm is scheduled to be commissioned in 2021.

Related Articles

Contracts & Tenders

Tekmar Hits Offshore Wind Trifecta in China

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago