offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Wind Turbine Up at Triton Knoll OWF
Wind Farm Update

January 25, 2021 · about 5 years ago

First Wind Turbine Up at Triton Knoll OWF

The first of the total of 90 offshore wind turbines has been installed at the Triton Knoll offshore wind farm site, located some 32 kilometres offshore Lincolnshire, UK. The wind farm is expected to generate first power this Spring, according to RWE. The 9.5 MW MHI Vestas wind turbines are being ins

1 minutes read
  • LinkedIn
  • X
  • Email
First wind turbine standing at the Triton Knoll project site

The first of the total of 90 offshore wind turbines has been installed at the Triton Knoll offshore wind farm site, located some 32 kilometres offshore Lincolnshire, UK.

The wind farm is expected to generate first power this Spring, according to RWE.

The 9.5 MW MHI Vestas wind turbines are being installed by DEME, which is using Cadeler’s Wind Osprey jack-up vessel.

The vessel arrived at the project site with the first sets of turbines last week, after loading the components at a turbine pre-assembly and construction base, established by Triton Knoll and Vestas at Able Seaton Port, in Teesside.

The 857 MW wind farm is scheduled for full commissioning in 2022.

Triton Knoll is owned by RWE (59%) and partners J-Power (25%) and Kansai Electric Power (16%), with RWE leading the construction on behalf of the partnership.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago