offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First GE Haliade 6 MW Nacelle Arrives at Saint-Nazaire OWF Pre-Assembly Site
Wind Farm Update

February 16, 2021 · about 5 years ago

First GE Haliade 6 MW Nacelle Arrives at Saint-Nazaire OWF Pre-Assembly Site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire. The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be

1 minutes read
  • LinkedIn
  • X
  • Email
The first GE nacelle arriving at the Saint-Nazaire pre-assembly site

The first nacelle for a GE Haliade 6 MW wind turbine for the French Saint-Nazaire offshore wind farm has arrived at the project’s pre-assembly site in the Port of Saint-Nazaire.

The nacelles are being produced in GE Renewable Energy’s factory in Montoir-de-Bretagne, from where the next units will be sent off to the wind turbine pre-assembly site this spring, according to Nantes-Saint Nazaire Port’s social media posts.

GE rolled out the first offshore wind turbine nacelle for the 480 MW Saint-Nazaire offshore wind farm at the factory in September 2020. The company is now expanding the factory to accommodate the assembly of nacelles for the much bigger Haliade-X offshore wind turbines.

The Saint-Nazaire offshore wind farm will comprise 80 Haliade 150-6 MW turbines, installed between 12 and 20 kilometres off the coast of the Guérande peninsula.

The 480 MW project, also known as Parc du Banc de Guérande, is scheduled to be operational in 2022 when it will become the first commercial-scale wind farm installed in French waters.

The wind farm is being developed by Eolien Maritime France (EMF), a consortium of EDF Renouvelables, Enbridge, and Canada Pension Plan Investment Board.

Related Articles

Business & Finance

GE Expanding Factory in France to House Haliade-X Nacelle Assembly

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

24 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

25 days ago