offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Foundation Transport and Installation Wanted for 900 MW German Offshore Wind Farm
Contracts & Tenders

February 19, 2021 · about 5 years ago

Foundation Transport and Installation Wanted for 900 MW German Offshore Wind Farm

EnBW has opened a tender looking for a company to transport and install the foundations for the He Dreiht offshore wind farm. The selected company will be in charge of the transport and installation of the transition pieces and monopiles, including the anode cages and grouted connection at the Germa

1 minutes read
  • LinkedIn
  • X
  • Email
Foundation Transport and Installation Wanted for 900 MW German Offshore Wind Farm

EnBW has opened a tender looking for a company to transport and install the foundations for the He Dreiht offshore wind farm.

The selected company will be in charge of the transport and installation of the transition pieces and monopiles, including the anode cages and grouted connection at the German project.

The scope also includes the installation of scour protection, including the supply of rock materials, handling, storage and logistics at the base port, as well as secondary, rest and potential repair works.

The start of offshore works is expected in the first quarter of 2024. The duration of the contract is from 1 January 2022 to 31 October 2024.

Interested companies are free to submit their applications for the tender by 18 March 15:00 local time.

German company Jörss — Blunck — Ordemann will provide a detailed design of wind turbine substructures and foundations for He Dreiht.

EnBW secured rights to develop the 900 MW project in April 2017 by placing a zero-subsidy bid in the first competitive tender in Germany.

The wind farm will feature turbines with an individual rated capacity of at least 7 MW , scheduled to be commissioned by 2025.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

19 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

20 days ago