offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Bourbon Subsea Services to Handle TetraSpar Demonstrator Floating Wind Turbine
Contracts & Tenders

March 23, 2021 · about 5 years ago

Bourbon Subsea Services to Handle TetraSpar Demonstrator Floating Wind Turbine

Bourbon Subsea Services will manage the transportation and installation of the 3.6 MW TetraSpar Demonstrator Floating Wind Turbine. This new turnkey stage, a part of Bourbon’s partnership with TetraSpar Demonstrator ApS, includes project management, engineering, installation, and offshore execution

2 minutes read
  • LinkedIn
  • X
  • Email
Quayside in the port of Grenaa, Denmark. TetraSpar foundation assembly

Bourbon Subsea Services will manage the transportation and installation of the 3.6 MW TetraSpar Demonstrator Floating Wind Turbine.

This new turnkey stage, a part of Bourbon’s partnership with TetraSpar Demonstrator ApS, includes project management, engineering, installation, and offshore execution from the assembly port in Grenaa, Denmark until the hookup and the inter-array cable installation on Metcenter Test site in Norway this summer.

The defining feature of the TetraSpar foundation concept is the modular “building block” arrangement: each foundation is assembled from tubular steel modules, most of which are common to all configurations.

Manufacturing takes place in factories using industrialized methods, and their assembly near the site as well as towing are measured in days or weeks, instead of months, Bourbon said.

Another particularity of TetraSpar Demonstrator is its stability provided by a keel deployed 50 metres below the floater. This keel deployment is the main challenge for the offshore installation.

Bourbon Subsea Services will deploy innovative methodology to connect this keel to the floater in port and later on once offshore, to lower it safely and efficiently, the company said.

“We have been very pleased to work with Bourbon Subsea Services during the first phases of the project. Bourbon Subsea Services bring valuable experience from floating wind execution to the team, and all the partners welcome their continued contribution as we move forward to the exciting next phases of the project,” Henrik Stiesdal , Chairman of the board of directors of TetraSpar Demonstrator ApS.

This is the fifth floating wind turbine project Bourbon Subsea Services has been awarded since the company decided to develop its activities towards renewable energy in 2011.

”We are particularly honoured to have reached this final phase of the TetraSpar Demonstrator project. This is the result of a long-term team collaboration between Bourbon Subsea Services and TetraSpar Demonstrator APS. It demonstrates our capacity to deliver safe and innovative solution in a highly cost constrained environment. We look forward to supporting TetraSpar Demonstrator ApS and its partners in successfully delivering this installation,” said Patrick Belenfant , CEO of Bourbon Subsea Services.

TetraSpar Demonstrator ApS is owned by Shell (46.2 per cent), TEPCO Renewable Power (30 per cent), RWE (23.1 per cent), and Stiesdal Offshore Technologies (0.7 per cent).

Related Articles

Business & Finance

TEPCO RP Buys Into TetraSpar Floater Demo Project

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersPorts & LogisticsR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago
New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less
Industry

New Study Shows How North Sea Offshore Wind Can Yield More While Costing Less

19 days ago