offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Geowynd Nets Contract for Borkum Riffgrund 3 OWF
Contracts & Tenders

April 1, 2021 · about 5 years ago

Geowynd Nets Contract for Borkum Riffgrund 3 OWF

The UK-based company Geowynd has signed a contract with Ørsted for the provision of consulting and engineering services for the Borkum Riffgrund 3 offshore wind farm in Germany. Geowynd will provide numerical analysis and advanced soil parameterisation for monopile foundation design at the Borkum Ri

2 minutes read
  • LinkedIn
  • X
  • Email
Ørsted's Borkum Riffgrund 2 offshore wind farm in Germany

The UK-based company Geowynd has signed a contract with Ørsted for the provision of consulting and engineering services for the Borkum Riffgrund 3 offshore wind farm in Germany.

Geowynd will provide numerical analysis and advanced soil parameterisation for monopile foundation design at the Borkum Riffgrund 3 offshore wind farm, located in the German sector of the North Sea.

“Geowynd are delighted to be working with Ørsted on this large 900 MW project. We’re excited to deploy our software CASCADE or Computational Approach for Soil Cyclic Accumulation with Drainage Effects” , said Mike Rattley , Director, Geowynd.

The CASCADE software is one of Geowynd’s proprietary tools for the advanced analysis of fixed-bottom support structures. According to the company, several more tools are set to be added to its inventory this year.

Ørsted is expected to reach a final investment decision on the 900 MW offshore wind farm by the end of 2021 and to put the project into operation in 2025.

Borkum Riffgrund 3 comprises three offshore wind projects originally awarded to Ørsted in auctions in 2017 and 2018, which were then bundled and renamed in September 2019. The project is adjacent to Ørsted’s existing offshore wind farms Borkum Riffgrund 1 and Borkum Riffgrund 2.

For the 900 MW offshore wind farm, Ørsted has already signed long-term corporate power purchase agreements (CPPAs) with Amazon and Covestro. Amazon will offtake the output of 250 MW and Covestro 100 MW from Borkum Riffgrund 3, each under a ten-year agreement.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago