offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›OES Group Scores He Dreiht Gig
Contracts & Tenders

April 6, 2021 · about 5 years ago

OES Group Scores He Dreiht Gig

Jörss – Blunck – Ordemann (JBO) has selected OES Group as the partner for the design of the cathodic protection system for the He Dreiht offshore wind project. The German Jörss – Blunck – Ordemann won a contract in February to provide a detailed design of wind turbine substructures and foundations f

1 minutes read
  • LinkedIn
  • X
  • Email
OES Group Scores He Dreiht Gig

Jörss – Blunck – Ordemann (JBO) has selected OES Group as the partner for the design of the cathodic protection system for the He Dreiht offshore wind project.

The German Jörss – Blunck – Ordemann won a contract in February to provide a detailed design of wind turbine substructures and foundations for He Dreiht.

The project will consist of 72 monopile structures that require internal and external cathodic protection, OES Group said.

He Dreiht is located within the German Exclusive Economic Zone (EEZ) of the North Sea, about 85 km north of the Borkum Island and 95 km west of the Helgoland Island.

In April 2017, EnBW secured rights to develop the 900 MW project by placing a zero-subsidy bid in the first competitive tender in Germany.

The wind farm will feature wind turbines with an individual rated capacity of at least 7 MW , scheduled to be commissioned by 2025.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago