offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Approval Galore for South Korean Wind Turbine Installation Vessel
Vessels

April 8, 2021 · about 5 years ago

Approval Galore for South Korean Wind Turbine Installation Vessel

South Korean ship designer and shipbuilder Samsung Heavy Industries (SHI) has received Approvals in Principle (AiPs) from three classification societies for its wind turbine installation vessel (WTIV) design. SHI’s low carbon emission ECO-WTIV (LNG Fuel + SOFC) model named SLW-FUEL CELL received AiP

1 minutes read
  • LinkedIn
  • X
  • Email
Approval Galore for South Korean Wind Turbine Installation Vessel

South Korean ship designer and shipbuilder Samsung Heavy Industries (SHI) has received Approvals in Principle (AiPs) from three classification societies for its wind turbine installation vessel (WTIV) design.

SHI’s low carbon emission ECO-WTIV (LNG Fuel + SOFC) model named SLW-FUEL CELL received AiPs from American Bureau of Shipping (ABS), DNV, and Lloyd’s Register at the same time.

According to SHI, ECO-WTIV is compliant with new emissions targets thanks to the adoption of technologies including LNG-fueled engines, solid oxide fuel cells (SOFC), and energy storage system (ESS).

The setup is projected to reduce the vessel’s CO2 emissions by approximately 50 per cent compared to existing ships powered by diesel engines.

SHI said the new vessel was designed in response to the growing offshore wind industry.

In December 2020, the shipbuilder partnered with Hyosung Heavy Industries, a Korean wind turbine gear unit equipment producer, to develop an enhanced and cost-effective jacking system for the WTIV.

”As the offshore wind industry grows, which is one of the pillars of the Green New Deal Policy, there will be more demand for WTIVs. It is very meaningful now that we secured our independent model featuring diverse cutting-edge green technologies,” said Wang K. Lee , Vice President of Offshore Business Division of SHI.

SHI has so far built and delivered three WTIV units to the offshore wind market, with the first order received back in 2010.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago