offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›BOEM Preparing Revolution Wind Environmental Review
Authorities

April 29, 2021 · about 5 years ago

BOEM Preparing Revolution Wind Environmental Review

The U.S. Bureau of Ocean Energy Management (BOEM) has issued a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the Construction and Operations Plan (COP) for the Revolution Wind project. The publication of the NOI opens a 30-day public comment period during which BOEM w

1 minutes read
  • LinkedIn
  • X
  • Email
BOEM Preparing Revolution Wind Environmental Review

The U.S. Bureau of Ocean Energy Management (BOEM) has issued a Notice of Intent (NOI) to prepare an Environmental Impact Statement (EIS) for the Construction and Operations Plan (COP) for the Revolution Wind project.

The publication of the NOI opens a 30-day public comment period during which BOEM will hold three virtual public scoping meetings and accept comments to inform the preparation of the EIS.

The virtual scoping meetings will be held on 13 and 18 May at 5:30 p.m., as well as on 20 May at 1:00 p.m.

BOEM’s scoping process is intended to identify what should be considered in the COP EIS. Comments are invited on the important resources and issues, impact-producing factors, reasonable alternatives and potential mitigating measures.

Revolution Wind is planned to have up to 100 turbines making a total capacity of up to 880 MW, expected to be put into operation in 2023.

It is located in federal waters approximately 17.4 nautical miles south of Rhode Island. Port of Galilee is identified as the location for an onshore O&M facility.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

14 days ago