CSBC-DEME Wind Engineering (CDWE) has signed an Exclusivity Capacity Agreement with CSBC for the fabrication and delivery of pin piles for the 300 MW Hai Long 2a offshore wind project in Taiwan.
CDWE, a joint venture between DEME and CSBC, inked a Balance of Plant (BOP) Preferred Supplier Agreement for Hai Long 2 and 3 in October 2019, under which it is in charge of the Engineering, Procurement, Construction and Installation (EPCI) of foundations, inter-array and export cables, and transportation and installation of turbines.
