offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›OHT Secures Green Loan for Alfa Lift
Business & Finance

May 12, 2021 · about 5 years ago

OHT Secures Green Loan for Alfa Lift

Norway’s OHT Alfa Lift AS has received and accepted a firm offer, subject to satisfactory documentation, for a USD 135 million Senior Secured Green ECA Credit Facility. The loan is for the post-delivery financing of the company’s wind foundation installation vessel Alfa Lift. The facility, to be dra

1 minutes read
  • LinkedIn
  • X
  • Email
Alfa Lift

Norway’s OHT Alfa Lift AS has received and accepted a firm offer, subject to satisfactory documentation, for a USD 135 million Senior Secured Green ECA Credit Facility.

The loan is for the post-delivery financing of the company’s wind foundation installation vessel Alfa Lift.

The facility, to be drawn upon delivery of the vessel, has a five-year term and a 12-year repayment profile.

DNB Bank ASA is the bookrunner and coordinator, and together with Sparebank 1 SR-Bank ASA, the mandated lead arranger.

Further, the Norwegian Export Credit Agencies GIEK and Eksportkreditt are supporting the facility, with their tranche estimated at USD 82.6 million.

Alfa Lift is currently under construction at China Merchants Heavy Industry (CMHI) shipyard in Jiangsu, China.

The vessel’s crane will have a maximum lifting capacity of 3,000 tonnes at 30 metres and 1,000 tonnes at 76 metres outreach. The 216.3-metre vessel will also have a 10,000+ m² “smart deck” that can carry up to 14 giant monopiles per trip, and will be fully submersible to a depth of 14.66 metres.

Designed by OHT in close cooperation with Ulstein Design & Solutions and DNV GL, Alfa Lift will be capable of installing all types of bottom-fixed offshore wind foundations and will also transport and install topsides and subsea modules, in addition to other heavy cargoes within oil and gas.

The vessel is expected to be delivered at the end of 2021 or in early 2022.

Related Articles

Vessels

Alfa Lift Ready for Final Assembly Works

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago
France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

13 days ago