The first of the total 165 wind turbines has been installed on the Hornsea Two offshore wind farm in the UK, where the wind turbine installation phase began this week, as reported in our Premium news on 27 May.
DEME’s installation vessel Sea Challenger , loaded with the first set of turbine components, arrived at the Hornsea Two site in the UK on 26 May.
