The first of two export cables has been installed at the nearshore of Thorntonloch Beach as part of the construction of the Neart na Gaoithe (NnG) offshore wind project in Scotland.
The offshore cable was transported to the nearshore area of Thorntonloch Beach by Prysmian’s 124-meter long cable laying vessel Cable Enterprise.

