China-based Orient Cable has started the first subsea cable laying work at the Binh Dai offshore wind project in Vietnam.
The scope of work includes pre-survey and post-survey, pre-lay grapnel run (PLGR), cable burial to a depth of 2.5 metres to 1.5 metres, inspection, and testing of the cable post burial.

