offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Fugro Starts Dogger Bank B Geophysical Survey
Wind Farm Update

June 23, 2021 · about 5 years ago

Fugro Starts Dogger Bank B Geophysical Survey

Fugro is set to commence a geophysical survey at the Dogger Bank B offshore wind farm in the UK today, 23 June. Survey vessel Fugro Froneiter will be conducting the survey between 23 June and approximately 30 August. Operations will be continuous, 24 hours a day, with the vessel towing subsea sensor

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro-starts-Dogger-Bank-B-geophysical-surveys

Fugro is set to commence a geophysical survey at the Dogger Bank B offshore wind farm in the UK today, 23 June.

Survey vessel Fugro Froneiter will be conducting the survey between 23 June and approximately 30 August.

Operations will be continuous, 24 hours a day, with the vessel towing subsea sensors up to approximately 300 meters behind.

In addition, the Celtic Mara will be carrying out a single line MBES survey along each of the Dogger Bank A and B route sections of the seabed.

The operation will be a one-day work scope when weather limits permit.

The 3.6 GW Dogger Bank offshore wind project is divided into three 1.2 GW phases, Dogger Bank A, Dogger Bank B, and Dogger Bank C.

Dogger Bank A and B will feature 190 Haliade-X 13 MW turbines scheduled to deliver the first electricity in 2023. The wind farm is slated for full commissioning in 2026.

Phases A and B are a joint venture between SSE Renewables (40 per cent), Equinor (40 per cent) and Eni (20 per cent), while Dogger Bank C is a joint venture between SSE Renewables and Equinor.

Related Articles

Vessels

Surveys Underway at Dogger Bank Wind Farm Cable Locations

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

22 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago