offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›MacGregor Receives Equipment Order for Two More Edda Wind CSOVs
Contracts & Tenders

July 7, 2021 · about 5 years ago

MacGregor Receives Equipment Order for Two More Edda Wind CSOVs

MacGregor, part of Cargotec, has received an order for access and lifting systems for two more Commissioning Service Operation Vessels (CSOVs) for Edda Wind. The company will deliver two identical equipment packages consisting of one electrical gangway system, one 3D compensated Colibri crane and a

1 minutes read
  • LinkedIn
  • X
  • Email
An artist impression of Edda Wind CSOVs and SOVs at an offshore wind farm

MacGregor, part of Cargotec, has received an order for access and lifting systems for two more Commissioning Service Operation Vessels (CSOVs) for Edda Wind.

The company will deliver two identical equipment packages consisting of one electrical gangway system, one 3D compensated Colibri crane and a remote control station located on the vessel bridge to the Astilleros Gondán shipyard in Asturias, Spain, which is building the vessels.

The two CSOVs, ordered in March, are sister vessels of two CSOVs already under construction in Spain and will join Edda Wind’s fleet in 2023 and 2024.

Astilleros Gondán launched the first of the now four CSOVs being built for Edda Wind this May.

The 88.3-metre CSOVs, designed by Salt Ship Design, are the first to use electric Voith Schneider Propellers (eVSP) and have been designed to to accommodate hydrogen technology in the future.

They will operate as mother vessels for wind turbine technicians as they perform commissioning and maintenance work on the offshore turbines, and will have the capacity to accommodate up to 120 personnel in high standard cabins and common areas.

All four vessels, along with two new SOVs Edda Wind is building at the Astilleros Balenciaga shipyard, will be equipped with MacGregor access and lifting systems.

Related Articles

Contracts & Tenders

Edda Wind Orders Two More CSOVs, Prepares for IPO

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

18 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago