offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Fugro to Survey Galloper Offshore Wind Extension
Grid Connection

July 16, 2021 · about 5 years ago

Fugro to Survey Galloper Offshore Wind Extension

Fugro has secured a contract to conduct geophysical and environmental site investigations at the Five Estuaries project, the extension of the operational Galloper offshore wind farm. Fugro Mercator has been appointed to carry out the geophysical survey at the UK project, which will start on 5 August

1 minutes read
  • LinkedIn
  • X
  • Email
Fugro Mercator

Fugro has secured a contract to conduct geophysical and environmental site investigations at the Five Estuaries project, the extension of the operational Galloper offshore wind farm.

Fugro Mercator has been appointed to carry out the geophysical survey at the UK project, which will start on 5 August and have a duration of approximately 14 weeks.

The vessel will be conducting operations across the main array and export cable route areas.

Fugro Seeker will perform the nearshore geophysical operations on the Five Estuaries export cable route for some 6-7 weeks, starting from 1 August.

Additionally, dive support vessel (DSV) Curtis Marshall will conduct the environmental survey from 2 November for two weeks at the main array and export cable route both offshore and nearshore.

The Five Estuaries offshore wind extension has a potential capacity of up to 353 MW.

Project partners are the same as at the Galloper wind farm and include a Macquarie-led consortium, RWE and Siemens Financial Services.

The project was announced in September last year when the parties signed lease agreements with The Crown Estate for extensions of the Galloper, Gwynt y Môr, Greater Gabbard and Rampion offshore wind farms.

Galloper, which was officially inaugurated in September 2018, comprises 56 Siemens Gamesa 6.3 MW turbines installed some 30 kilometers off the coast of Suffolk.

Related Article

RWE Starts Power Performance Testing on Galloper OWF Turbines

Related Articles

Business & Finance

RWE Signs Lease Agreements for Four UK Offshore Wind Extensions

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago