offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Equinor Gets Permission to Build Dogger Bank O&M Base
Operations & Maintenance

July 21, 2021 · about 5 years ago

Equinor Gets Permission to Build Dogger Bank O&M Base

South Tyneside Council’s Planning Committee has granted permission for the construction of Dogger Bank Wind Farm’s operations and maintenance (O&M) base in the Port of Tyne. Equinor submitted an application with the accompanying planning documents to the Planning Committee in February, requesting pe

1 minutes read
  • LinkedIn
  • X
  • Email
An image rendering Dogger Bank O&M base

South Tyneside Council’s Planning Committee has granted permission for the construction of Dogger Bank Wind Farm’s operations and maintenance (O&M) base in the Port of Tyne.

Equinor submitted an application with the accompanying planning documents to the Planning Committee in February, requesting permission to build the O&M base and warehouse with associated access, parking, landscaping and engineering operations.

The O&M base will be built at a 1.82-hectare site at the former McNultys Quay, Corstorphine Town, South Shields.

The facility will serve as the main hub for operating the 3.6 GW Dogger Bank Wind Farm which, once complete, will be capable of powering six million homes.

Equinor and SSE Renewables revealed the design for the O&M base in March, saying that the operation of the wind farm for its lifetime of up to 35 years will create over 200 direct jobs in the North East of England.

Dogger Bank is being built in three equal phases of 1.2 GW each.

The first two phases, Dogger Bank A and B, are a joint venture between Equinor (40 per cent), SSE Renewables (40 per cent) and Eni (20 per cent).

The third phase, Dogger Bank C, is being developed on a different timescale and is owned by Equinor (50 per cent) and SSE Renewables (50 per cent).

SSE Renewables is leading the construction of the wind farm and Equinor will be responsible for its operation.

Related Articles

Operations & Maintenance

Dogger Bank Unveils Operations and Maintenance Base Design

3 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

11 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago