offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Hydrographic Survey to Start at Welsh Offshore Wind Farm
Grid Connection

July 21, 2021 · about 5 years ago

Hydrographic Survey to Start at Welsh Offshore Wind Farm

An uncrewed surface vessel (USV) is set to begin a hydrographic survey at the operational Gwynt y Môr offshore wind project located off the North Wales Coast. The USV will be performing the hydrographic survey of the export routes from 26 July for up to 7 days until 2 August, subject to weather cond

1 minutes read
  • LinkedIn
  • X
  • Email
Welsh Offshore Wind Farm to Host Hydrographic Survey

An uncrewed surface vessel (USV) is set to begin a hydrographic survey at the operational Gwynt y Môr offshore wind project located off the North Wales Coast.

The USV will be performing the hydrographic survey of the export routes from 26 July for up to 7 days until 2 August, subject to weather conditions.

The vehicle will be mobilised from Rhyl Harbour, Denbighshire, where it will transit to and from the area of operation.

A support RIB Maverick will escort the USV throughout the operations from the harbour entrance and will then continue transiting towards the survey site until the area is safe and clear of hazards.

Located some 15 kilometers off the North Coast of Wales, Gwynt y Môr comprises 160 3.6 MW Siemens turbines and two offshore substations.

The 576 MW offshore wind farm, owned by RWE, Stadtwerke München, and Macquarie Infrastructure and Real Assets (MIRA), was put into operation in 2015.

Related Articles

Business & Finance

New Export Cable for Gwynt y Môr After Year of Cable Issues

3 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago