offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Seagreen Offshore Wind Farm Set for Geotechnical Survey
Wind Farm Update

July 27, 2021 · about 5 years ago

Seagreen Offshore Wind Farm Set for Geotechnical Survey

A geotechnical survey is set to begin along the proposed export cable route at the Seagreen Phase 1A offshore wind farm. The survey vessel Northern Ocean will conduct the seabed cone penetration tests and vibro core sampling within the export cable area and the Seagreen array site boundary. The surv

1 minutes read
  • LinkedIn
  • X
  • Email
A photo of an offshore wind farm

A geotechnical survey is set to begin along the proposed export cable route at the Seagreen Phase 1A offshore wind farm.

The survey vessel Northern Ocean will conduct the seabed cone penetration tests and vibro core sampling within the export cable area and the Seagreen array site boundary.

The survey is expected to start on or around 1 August with the works expected to be completed in 33 days.

Recently, a shallow geotechnical survey involving sediment probing and ROV inspections of the seabed was carried out within the export cable area.

Seagreen offshore wind farm, owned by TotalEnergies and SSE Renewables, is located 27 kilometres off the Angus coastline.

The Scottish wind farm will feature 114 Vestas 10 MW turbines expected to be operational in 2022/2023.

Last year, Nexans secured the contract to supply and install three 65-kilometre offshore export cables and three 20-kilometre onshore export cables for the 1,075 MW project.

The company will use its newbuild DP3 cable laying vessel (CLV) Nexans Aurora for the offshore installation.

Related Articles

Wind Farm Update

Export Cable Survey to Begin at Seagreen OWF

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

21 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

23 days ago