offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›JDR Adopts Resonant Test Tech for 66kV Inter-Array Cables
Business & Finance

September 3, 2021 · about 4 years ago

JDR Adopts Resonant Test Tech for 66kV Inter-Array Cables

JDR Cable Systems has adopted HIGHVOLT Prüftechnik Dresden’s Resonant Test System (RTS) for testing inter-array cables at offshore wind projects. The test system is purpose-built for post-installation testing of 66 kV offshore inter-array cables according to the international standard IEC 63026. T

2 minutes read
  • LinkedIn
  • X
  • Email
JDR Adopts Resonant Test Tech for 66kV Inter-Array Cables

JDR Cable Systems has adopted HIGHVOLT Prüftechnik Dresden’s Resonant Test System (RTS) for testing inter-array cables at offshore wind projects.

The test system is purpose-built for post-installation testing of 66 kV offshore inter-array cables according to the international standard IEC 63026.

The plan is to have it DNV certified and smaller in scale compared to the onshore equivalent to allow for the demanding logistics of working offshore.

According to JDR, given the potential reliability issues related to the increasing voltages in inter-array cables, it was clear that an improvement in test technology was required.

HIGHVOLT developed this system in response to the technical requirements and field experiences of key industry stakeholders, the company added.

JDR is the first cable manufacturer to invest in this technology.

“JDR has looked at what our clients need, to adhere to the latest IEC 63026 Submarine Power Cable standard and how we can support them to satisfy insurers the wind farm installation is fit for purpose,” said Ross Piercey , asset manager at JDR Cables.

“It’s clear that with the upgrade to 66 kV inter arrays, a more robust post-installation test method is needed, to ensure the cable and all accessories are defect-free upon install. JDR will be the first offshore test and terminations company to offer Resonance, VLF & DAC technologies to our customers.”

The system is due to be used on a “ major UK-based offshore wind farm ” in mid-late 2021.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionOperations & MaintenanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

13 days ago