offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›NED-Project Introduces Hydrogen-Ready, Jones Act-Compliant Offshore Wind Installation Vessel
Vessels

September 24, 2021 · about 4 years ago

NED-Project Introduces Hydrogen-Ready, Jones Act-Compliant Offshore Wind Installation Vessel

NED-Project, a Poland-headquartered naval architecture and ship design company with an office in the US, has developed a new wind turbine installation vessel (WTIV), which features a hydrogen-ready set-up and has the capability to install 15-20 MW wind turbines as well as to load and transport monop

2 minutes read
  • LinkedIn
  • X
  • Email
An image rendering NED-Project's wind turbine installation vessel

NED-Project, a Poland-headquartered naval architecture and ship design company with an office in the US, has developed a new wind turbine installation vessel (WTIV), which features a hydrogen-ready set-up and has the capability to install 15-20 MW wind turbines as well as to load and transport monopiles vertically.

The vessel design, NP20000X ULAM, which is intended to be Jones Act-compliant, has been awarded Approval in Principle (AIP) by the American Bureau of Shipping (ABS).

The design is hydrogen-ready with the engine rooms able to be converted into fuel cell compartments accommodating polymer electrolyte membrane fuel cells, making it possible to rely solely on liquefied hydrogen (LH2) to meet its energy demands.

The vessel features an 8,000 square-metre deck on which monopiles could be loaded vertically, eliminating the need to rotate them to the vertical position at sea. The NP20000X ULAM design also incorporates a leg-encircling heavy cargo crane with a working load of 3,500 tonnes capable of handling turbines of 240-metre rotor diameter and 150-metre tower height.

NED-Project Inc. is working with GPZ Energy to develop ULAM WTIV projects for the US market.

The first Jones Act-compliant WTIV set to serve the US market is Dominion Energy’s Charybdis , also being built to ABS Class. The vessel is expected to be sea-ready by late 2023 and will first be deployed out of New London harbor in Connecticut to support the construction of Revolution Wind and Sunrise Wind, both under joint development by Ørsted and Eversource.

The two offshore wind developers have also already chartered the first US Service Operations Vessel (SOV) , also Jones Act-compliant and classified by ABS, which will be operated by Edison Chouest Offshore (ECO).

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

22 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

17 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

22 days ago