offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Blue Gem to Deploy Floating LiDAR at Valorous Project Site
Wind Farm Update

September 27, 2021 · about 4 years ago

Blue Gem to Deploy Floating LiDAR at Valorous Project Site

Blue Gem Wind, a joint venture between TotalEnergies and Simply Blue Energy, is preparing to deploy a floating LiDAR at the Valorous floating wind project site to inform the engineering designs and the Environmental Impact Assessments (EIA) for the proposed project. The EOLOS FLS200 floating LiDAR s

2 minutes read
  • LinkedIn
  • X
  • Email
A map showing the location of the Valorous floating wind farm

Blue Gem Wind, a joint venture between TotalEnergies and Simply Blue Energy, is preparing to deploy a floating LiDAR at the Valorous floating wind project site to inform the engineering designs and the Environmental Impact Assessments (EIA) for the proposed project.

The EOLOS FLS200 floating LiDAR system will be towed from the harbour in Milford and deployed at the site located approximately 50 kilometres South West of the Pembrokeshire coastline. The works are expected to take place between 4 October and 10 October.

The floating LiDAR will remain at the site for twelve months to gather the necessary data to inform the proposed project, which could have an installed capacity of 300 MW.

At the beginning of this year, Blue Gem Wind submitted a scoping report for the Valorous floating offshore wind farm, the second floating wind project being progressed by the joint venture in the Celtic Sea, following the 96 MW Erebus test and demonstration project already in development.

Earlier this year, developer launched offshore digital aerial surveys at the project site and metocean studies for both the Erebus and Valorous projects.

TotalEnergies and Simply Blue Energy established Blue Gem Wind in March 2020 to develop floating offshore wind projects in the Welsh waters of the Celtic Sea.

Shortly after that, the partnership secured seabed rights to develop the Erebus project at a site located 45 kilometres South West of the Pembrokeshire coastline. The 96 MW wind farm will feature up to 10 turbines on Principle Power’s WindFloat platforms.

NOTE: The original article has been updated.

Related Articles

Wind Farm Update

Aerial Surveys Underway at TotalEnergies’ 300 MW Floating Wind Project Site

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

12 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

13 days ago