Van Oord has ordered a new self-elevating offshore installation vessel that will be able to operate on methanol and install wind turbines with a capacity of up to 20 MW.
The vessel is being built by the Yantai CIMC Raffles Shipyard in China. The design is by Knud E Hansen.

