offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›EnBW Looking for Wind Turbine Hydraulics O&M Services for Baltic 2 OWF
Contracts & Tenders

October 12, 2021 · about 4 years ago

EnBW Looking for Wind Turbine Hydraulics O&M Services for Baltic 2 OWF

EnBW has opened a tender for the replacement of hydraulic hoses and change of the hydraulic and transmission oil on the wind turbines at the EnBW Baltic 2 offshore wind farm. The work is scheduled to be carried out on all the offshore wind farm’s turbines in 2022, and also includes the procurement o

1 minutes read
  • LinkedIn
  • X
  • Email
EnBW Looking for Wind Turbine Hydraulics O&M Services for Baltic 2 OWF

EnBW has opened a tender for the replacement of hydraulic hoses and change of the hydraulic and transmission oil on the wind turbines at the EnBW Baltic 2 offshore wind farm.

The work is scheduled to be carried out on all the offshore wind farm’s turbines in 2022, and also includes the procurement of all necessary materials, disposal, and the provision of necessary logistics.

The tender has been divided into two lots, with one lot dedicated to the replacement of hydraulic hoses and one to the change of hydraulic and transmission oil. Bidders can compete for one or both lots.

The contract to be awarded under the tender, which is open until 8 November, will run from 1 April to 31 October 2022.

The 288 MW EnBW Baltic 2 comprises 80 Siemens SWT-3.6-120 wind turbines, installed in German territorial waters in the Baltic Sea, at a site with water depths ranging from 23 to 44 metres.

The wind farm has been supplying some 340,000 households with renewable electricity since 2015, when it went into commercial operation.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago