offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›BOEM Designates Wind Area Offshore California
Authorities

November 15, 2021 · about 4 years ago

BOEM Designates Wind Area Offshore California

The US Bureau of Ocean Energy Management (BOEM) has designated the Morro Bay Wind Energy Area offshore California. The area is located approximately 20 miles offshore the central California coastline and contains approximately 240,898 acres (376 square miles). BOEM will now prepare an Environmental

2 minutes read
  • LinkedIn
  • X
  • Email
BOEM Designates Wind Area Offshore California

The US Bureau of Ocean Energy Management (BOEM) has designated the Morro Bay Wind Energy Area offshore California.

The area is located approximately 20 miles offshore the central California coastline and contains approximately 240,898 acres (376 square miles).

BOEM will now prepare an Environmental Assessment (EA), as required under the National Environmental Policy Act, to consider potential impacts from site characterization activities (e.g., biological, archeological, geological, and geophysical surveys) and site assessment activities (e.g., installation of meteorological buoys) within the area.

BOEM’s preparation of the EA initiated a public comment period along with two virtual public meetings.

”Offshore wind presents a significant opportunity for California and our nation as we transition to clean, renewable energy. Today’s announcement represents significant progress towards that future,” said BOEM Director Amanda Lefton .

”As the process continues, BOEM is committed to environmental reviews, which are critical for a strong resource management program, and to robust public engagement.”

The 60-day public comment period began on 12 November and will extend through to 11 January, 2022. BOEM will hold two virtual public meetings during this time.

Once BOEM considers all public input, the agency will publish a draft EA for public review and comment. The analyses contained in the EA will help BOEM determine whether to move forward with the area for a proposed lease sale.

Related Article

US Opens Pacific Coast for (Floating) Offshore Wind

The goal of BOEM’s Wind Area Identification process is to identify the offshore locations that appear most suitable for wind energy development, taking into consideration potential impacts to resources and ocean users.

The Morro Bay area was designated after collaboration with other federal agencies and the State of California as well as engagement with ocean users, Tribes, local communities, and the public, BOEM said.

It includes portions of the area initially analyzed in BOEM’s Call for Information and Nominations published in October 2018, and two extensions analyzed in BOEM’s Call for Information and Nominations published in July 2021.

Related Article

BOEM to Gauge Industry Interest in Two New Wind Energy Areas Offshore California

BOEM completed its review of a Construction and Operations Plan (COP) for the Vineyard Wind project earlier this year and is currently reviewing ten additional COPs. Moreover, BOEM plans to review at least an additional five COPs by 2025, for a total of at least 16 COP reviews representing more than 19 GW of clean energy.

Related Articles

Authorities

California’s Offshore Wind Bill Signed into Law

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesContracts & TendersEnvironment

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light
Authorities

700 MW Lithuanian Offshore Wind Project Gets Environmental Protection Agency’s Green Light

24 days ago