offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›MingYang Receives SSDA Conformity Statement for Taranto OWF from TÜV NORD
Technology

November 16, 2021 · about 4 years ago

MingYang Receives SSDA Conformity Statement for Taranto OWF from TÜV NORD

TÜV NORD has handed over the site specific design assessment (SSDA) conformity statement for the Italian Taranto offshore wind farm project to MingYang Smart Energy, the project’s wind turbine supplier. “The SSDA is important for developers or investors to verify the suitability of a turbine for spe

1 minutes read
  • LinkedIn
  • X
  • Email
MingYang Receives SSDA Conformity Statement for Taranto OWF from TÜV NORD

TÜV NORD has handed over the site specific design assessment (SSDA) conformity statement for the Italian Taranto offshore wind farm project to MingYang Smart Energy, the project’s wind turbine supplier.

“The SSDA is important for developers or investors to verify the suitability of a turbine for specific wind farm site conditions. It includes integrated load analysis under consideration of the site-specific environmental conditions as well as the site-specific support structure and foundation. Based on this, type applicability evaluation ensures suitability of the wind turbines types with its components for the expected loads as well as operation conditions of the panned wind farm setup”, TÜV NORD explained.

The developer of the 30 MW project, Renexia, placed an order with MingYang at the beginning of this year, switching from the initially planned Senvion 3.0M122 turbines and marking the first time a Chinese OEM supplied turbines for the European offshore wind market.

MingYang completed the production of ten of its MySE 3.0-135 wind turbines for the Italian offshore wind farm in August and delivered all of them to the project team in Italy in early October.

The 30 MW Taranto offshore wind farm, also known as Beleolico, is located near the Taranto harbour in Italy.

The 30 MW project, scheduled to be put into operation in 2022, is the first offshore wind farm under construction in Italy and the first commercial offshore wind power project in the Mediterranean region.

Related Articles

Wind Farm Update

MingYang Turbines for Taranto OWF Arrive in Italy

1 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago