offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Akrocean to Gauge Winds at Two German North Sea Sites
Contracts & Tenders

December 24, 2021 · about 4 years ago

Akrocean to Gauge Winds at Two German North Sea Sites

French offshore monitoring and site assessment service provider Akrocean has won a tender to carry out meteorological measurements at two sites of the German N-10 offshore wind area. The company will perform monitoring of wind conditions and prepare a report as part of the preliminary investigation

2 minutes read
  • LinkedIn
  • X
  • Email
A photo of the Albatros offshore wind farm

French offshore monitoring and site assessment service provider Akrocean has won a tender to carry out meteorological measurements at two sites of the German N-10 offshore wind area.

The company will perform monitoring of wind conditions and prepare a report as part of the preliminary investigation of the N-10.1 and N-10.2 sites in the N-10 area in the German North Sea that is part of the Federal Maritime and Hydrographic Agency’s (BSH) 2020 area development plan.

The work scope covers two in-situ measurements, each running for at least one year, with two independent measuring devices, which should enable an assessment of the wind and other conditions, including the wind speed, wind direction, air humidity, air pressure, air temperature, and water temperature.

The aim is to generate the most accurate information possible about the wind conditions in the areas in the German North Sea intended for the construction of wind farms in area N-10 of the BSH’s area development plan 2020.

Based on the measurements, Akrocean will produce a final report on the wind conditions in areas N-10.1 and N-10.2 with statistics to be compared with independent reference data.

The N-10.1 and N-10.2 development areas are located northwest of the Albatros and GlobalTech I offshore wind farms, which are already in operation, and border the Europipe I gas pipeline with their southwest flank.

Earlier this year, Germany’s Federal Maritime and Hydrographic Agency selected Fugro and VBW Weigt to carry out geophysical investigations and hydrographic surveys at the two wind energy areas as part of the geological preliminary exploration.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago