offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›California Offshore Wind Energy Area Reaches New Milestone
Authorities

January 12, 2022 · about 4 years ago

California Offshore Wind Energy Area Reaches New Milestone

The US Bureau of Ocean Energy Management (BOEM) has released the draft Environmental Assessment (EA) on the potential impacts from future commercial leasing and related site characterization and assessment activities within the Humboldt Wind Energy Area (WEA) offshore California. The Humboldt WEA is

2 minutes read
  • LinkedIn
  • X
  • Email
California Offshore Wind Energy Area Reaches New Milestone

The US Bureau of Ocean Energy Management (BOEM) has released the draft Environmental Assessment (EA) on the potential impacts from future commercial leasing and related site characterization and assessment activities within the Humboldt Wind Energy Area (WEA) offshore California.

The Humboldt WEA is approximately 206 square miles that, if developed, could bring up to 1.6 GW of clean energy to the grid, enough to power approximately 560,000 homes.

The draft EA considers potential environmental impacts and socioeconomic effects from issuing offshore wind energy leases and related site characterization and assessment activities within the Humboldt WEA.

Site characterization activities include geophysical, geotechnical, archaeological, and biological surveys needed to develop specific project proposals on those leases. Site assessment activities could include the installation and operation of meteorological buoys in support of leases that may be issued.

”BOEM is requesting public comments on the adequacy of our environmental analysis and of the measures designed to avoid or reduce potential environmental impacts,” said BOEM’s Pacific Office regional director Doug Boren .

”BOEM will consider such comments before determining whether to issue a finding of no significant impact or to conduct additional analyses under the National Environmental Policy Act.”

Before approving the construction of any offshore wind energy facility on a potential future lease in the Humboldt WEA, BOEM will develop an Environmental Impact Statement to analyze the specific environmental consequences of constructing and operating such a facility, in consultation with Tribes and appropriate federal, state, and local agencies, and with participation by stakeholders and the public.

BOEM is also requesting public comments related to potential impacts to historic properties from commercial leasing and site characterization and assessment activities in the Humboldt WEA. This is part of BOEM’s National Historic Preservation Act Section 106 Programmatic Agreement with the State of California covering wind energy development offshore that state.

The announcement initiates a 30-day public review and comment period on the draft EA, which will end on 10 February.

To facilitate public input, BOEM will host two virtual meetings. The first meeting will be held on 25 January 25, and the second meeting will be held on 26 January.

The boundary of the Humboldt WEA begins at 21 miles (34 km) offshore the city of Eureka in northern California. The area is about 28 miles (45 km) in length from north to south and about 14 miles (23 km) in width from east to west.

Related Article

California Allocates USD 45 Million to Kick-Start Offshore Wind in USD 2 Billion Clean Energy Budget

Related Articles

Authorities

US to Hold Seven Offshore Wind Auctions in Next Three Years

3 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesEnvironment

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

25 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

25 days ago