offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Foundations Stand at First Mediterranean Offshore Wind Farm
Ports & Logistics

January 13, 2022 · about 4 years ago

Foundations Stand at First Mediterranean Offshore Wind Farm

Van Oord’s jack-up MPI Resolution has installed the ten monopile foundations at the first wind farm to be built in the Mediterranean Sea – the 30 MW Taranto offshore wind farm. The Taranto offshore wind farm, also known as Beleolico, is located in Italy’s Apulia Region near the Taranto harbour. The

1 minutes read
  • LinkedIn
  • X
  • Email
A photo of the MPI Resolution vessel loading a monopile for the Taranto offshore wind farm in Italy

Van Oord’s jack-up MPI Resolution has installed the ten monopile foundations at the first wind farm to be built in the Mediterranean Sea – the 30 MW Taranto offshore wind farm.

The Taranto offshore wind farm, also known as Beleolico, is located in Italy’s Apulia Region near the Taranto harbour.

The wind farm will comprise ten MySE 3.0-135 wind turbines provided by MingYang Smart Energy.

Related Article

MingYang Turbines for Taranto OWF Arrive in Italy

”At this moment preparations are being made for the installation of the turbines and the expectation is that this will be completed in February,” a spokesperson for Van Oord told offshore WIND.

MPI Resolution is in charge of installing the wind farm’s monopiles, secondary steel, and the wind turbines.

The wind farm is scheduled to be fully commissioned in 2022 and provide about 55,600 MWh of electricity per year, enough to meet the demand of around 18,500 households, Renexia SpA, the developer of the project, said.

Related Articles

Vessels

Monopile Load-Out Starts for Italy’s First Offshore Wind Farm

2 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago