offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›US Offshore Wind Farm Entering Construction Phase
Grid Connection

January 18, 2022 · about 4 years ago

US Offshore Wind Farm Entering Construction Phase

Construction work on the 132 MW South Fork wind farm offshore New York is scheduled to start on or about 28 January, South Fork Wind, a joint venture between Ørsted and Eversource Energy, said. According to the developer, the project has now received necessary permits to install the export cable sys

1 minutes read
  • LinkedIn
  • X
  • Email
US Offshore Wind Farm Entering Construction Phase

Construction work on the 132 MW South Fork wind farm offshore New York is scheduled to start on or about 28 January, South Fork Wind, a joint venture between Ørsted and Eversource Energy, said.

According to the developer, the project has now received necessary permits to install the export cable system onshore and in the New York State waters, as well as the associated interconnection facility in the Town of East Hampton in Suffolk County, Long Island.

The South Fork wind farm will comprise twelve 11 MW Siemens Gamesa turbines installed at the project site some 30 kilometres (19 miles) southeast of Block Island, Rhode Island, and some 56 kilometres (35 miles) east of Montauk Point, New York.

Related Article

US Approves Second Commercial Scale Offshore Wind Project

Offshore installation of the project’s monopile foundations and the 11 MW Siemens Gamesa wind turbines is expected to begin in summer 2023.

Related Article

First-Ever ‘Made in USA’ Offshore Substation to Be Built for South Fork OWF

Related Articles

Contracts & Tenders

South Fork Partners Award Onshore Work to Local Construction Company

3 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago