offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Heerema Shows XXL Offshore Wind Turbine Floating Installation Method – Video
Ports & Logistics

February 4, 2022 · about 4 years ago

Heerema Shows XXL Offshore Wind Turbine Floating Installation Method – Video

Following the recent completion of the first offshore test, Heerema Marine Contractors has issued a video showing a novel method of assembling and installing XXL wind turbines onboard a floating, dynamically positioned (DP) vessel. The method was tested in the Dutch North Sea onboard the largest sem

2 minutes read
  • LinkedIn
  • X
  • Email
Heerema Shows XXL Offshore Wind Turbine Floating Installation Method – Video

Following the recent completion of the first offshore test, Heerema Marine Contractors has issued a video showing a novel method of assembling and installing XXL wind turbines onboard a floating, dynamically positioned (DP) vessel.

The method was tested in the Dutch North Sea onboard the largest semi-submersible crane vessel in the world, Sleipnir .

Heerema performed the demonstration project, known as Floating Offshore Installation of XXL Wind Turbines (FOX), in collaboration with DOT and the Delft University of Technology (TU Delft) to collect operational data and test installation methods and durations.

This demonstration project was supported by the Dutch Ministry of Economic Affairs and Climate Policy and Eneco . The partners worked together with a wide range of subcontractors who have supported this test, including Heerema Engineering Solutions, F&B Group, Harco Heavy Lifting, Ampelmann, Sif, and CAPE Holland .

The novel Rotor Nacelle Assembly (RNA) method, developed by Heerema for the next generation of wind turbines, will for the first time be utilised on Parkwind’s Arcadis Ost 1 offshore wind farm in the German Baltic Sea.

Related Article

Arcadis Ost 1 First to Use Floating Turbine Installation Method

Heerema will deploy the second-largest semi-submersible vessel in the world, Thialf , on the project.

As previously reported, Thialf will have to undergo certain modifications to the cranes in order to be able to sail under Denmark’s Storebaelt Bridge and enter the Baltic Sea.

Related Article

Heerema Unlocking Baltic Sea with Thialf Crane Modifications

Thialf is scheduled to start installing the 27 Vestas 9.5 MW wind turbines at Arcadis Ost I using the RNA method later this year.

This content is available after accepting the cookies.

Related Articles

R&D

Heerema Tests Floating Installation of XXL Turbines Method Offshore

4 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsR&DVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago