offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Asia’s First Newbuild SOV Completes Sea Trials – Video
Operations & Maintenance

February 9, 2022 · about 4 years ago

Asia’s First Newbuild SOV Completes Sea Trials – Video

The first service operation vessel (SOV) built for the Asian offshore wind market completed six days of sea trials offshore Vietnam back in January. The SOV, to be named TSS Pioneer, is being built by Vard at the Vung Tau shipyard in Vietnam. The vessel will soon be delivered to Ta San Shang Marine,

1 minutes read
  • LinkedIn
  • X
  • Email
Asia’s First Newbuild SOV Completes Sea Trials – Video

The first service operation vessel (SOV) built for the Asian offshore wind market completed six days of sea trials offshore Vietnam back in January.

The SOV, to be named TSS Pioneer, is being built by Vard at the Vung Tau shipyard in Vietnam.

The vessel will soon be delivered to Ta San Shang Marine, a joint company owned by Mitsui O.S.K. Lines (MOL) and Ta Tong Marine.

Following the delivery, TSS Pioneer will start a 15-year charter with Ørsted.

The SOV will be deployed on the 900 MW Greater Changhua 1 and 2a wind farm offshore Taiwan for operations and maintenance.

The 84.4-metre vessel has a beam of 19.5 metres and can accommodate 87 people in single cabins. It features a motion-compensated gangway, dynamic positioning system, and a 3D motion-compensated crane. The propulsion is hybrid with a diesel-electric solution.

Located some 35 to 50 kilometres off the coast of Changhua County, Greater Changhua 1 and 2a will comprise two offshore substations and 111 Siemens Gamesa 8 MW wind turbines, scheduled to be fully operational by the end of 2022.

This content is available after accepting the cookies.

Source: MOL/YouTube Follow offshoreWIND.biz on:

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago