offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›RVO to Launch Morphological and Scour Assessment Tender for IJmuiden Ver Wind Farm Zone
Contracts & Tenders

February 18, 2022 · about 4 years ago

RVO to Launch Morphological and Scour Assessment Tender for IJmuiden Ver Wind Farm Zone

The Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland; RVO) will open a tender for morphological and scour assessment of the IJmuiden Ver Wind Farm Zone in March, according to a prior information notice RVO issued on 14 February. The successful candidate will conduct a study into

2 minutes read
  • LinkedIn
  • X
  • Email
IJmuiden Ver

The Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland; RVO) will open a tender for morphological and scour assessment of the IJmuiden Ver Wind Farm Zone in March, according to a prior information notice RVO issued on 14 February.

The successful candidate will conduct a study into the morphological and scouring conditions at the offshore wind farm zone, starting in June 2022.

The work will be carried out utilising available data from (geophysical and geotechnical) surveys and other sources of information to improve the understanding of the seabed morphology and morphodynamics of the IJmuiden Ver Wind Farm Zone. The study will consist of analyses of the autonomous seabed dynamics and also the scouring that is to be expected during the lifetime of an offshore windfarm.

The acquired information will be made publicly available to all potential bidders for offshore wind farms in the Netherlands.

For geotechnical and geophysical surveys, RVO awarded contracts to GEOxyz and Fugro back in 2020 and in November last year the Agency appointed DNV and Arcadis to support RVO in managing offshore wind farm site studies at six sites within the IJmuiden Ver Wind Farm Zone.

The IJmuiden Ver Wind Farm Zone currently has four sites with a potential to house a total installed capacity of 4 GW progressing towards being auctioned.

The Dutch government is set to issue a tender for IJmuiden Ver I and II sites in 2023, and the IJmuiden Ver III and IV sites will be put to tender two years later.

At last year’s Offshore Energy Exhibition and Conference (OEEC) in Amsterdam, RVO and TenneT said it was likely that the IJmuiden Ver zone would have 6 GW instead of 4 GW of total installed offshore wind capacity, with the zone planned to comprise six areas instead of four, which was subject to a final decision within the framework of the North Sea Programme.

The Dutch government released an Additional Draft North Sea Programme 2022 – 2027 in November 2021, increasing the country’s offshore wind target from the current 11.5 GW to 22.2 GW by 2030.

Follow offshoreWIND.biz on:

Related Articles

Grid Connection

RVO Talks 6 GW for IJmuiden Ver Offshore Wind Zone

3 min read

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago